Close Menu
HFG Insider

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    “It irritates me”: Richa Chadha on Ali Fazal’s “annoying” parenting, constant worries over daughter Zuni and why it is still a “good problem” |

    October 1, 2026

    Pink ball in daytime Tests, penalties for time-wasting: ICC announces new playing conditions across men’s and women’s cricket | Cricket News

    October 1, 2026

    A uranium mill left radioactive waste beside Utah’s Colorado River for decades; after trains began hauling it away in 2009, crews have now removed 17 million tons to a disposal site 30 miles away

    October 1, 2026
    Facebook X (Twitter) Instagram
    Trending
    • “It irritates me”: Richa Chadha on Ali Fazal’s “annoying” parenting, constant worries over daughter Zuni and why it is still a “good problem” |
    • Pink ball in daytime Tests, penalties for time-wasting: ICC announces new playing conditions across men’s and women’s cricket | Cricket News
    • A uranium mill left radioactive waste beside Utah’s Colorado River for decades; after trains began hauling it away in 2009, crews have now removed 17 million tons to a disposal site 30 miles away
    • Jim Carrey lists $35 million Maui mansion after secretly marrying longtime girlfriend Min Ah; 4,000-sq-ft oceanfront estate features private beach frontage, pool and guest house | English Movie News
    • “Just remember him leaving and the next time I saw him was in…”: Nimrat Kaur recalls tragic loss of her father in Kashmir and how the tragedy shaped her understanding of loss
    • Asian Games 2026 Medal Tally: India hold eighth place after historic medals in wrestling and sailing | Asian Games 2026 News
    • In 2011, Stephen King and Tabitha’s foundation gave $120,000 to help heat Maine homes, as their radio fundraiser brought in $241,820 for residents facing a winter with reduced federal aid
    • Nimrat Kaur says that the bar is raised post Ranveer Singh’s ‘Dhurandhar’: ‘When something is done so well that people have tasted of how authentic..’ |
    Facebook Instagram Pinterest YouTube Tumblr Bluesky Threads
    HFG Insider
    Subscribe Buy Now
    Thursday, October 1
    • Home
    • Education
    • Entertainment
    • Environment
    • Sports
    • Tech
    • World
    • Lifestyle
    • Contact Us
    • About Us
    HFG Insider
    Home»World»A uranium mill left radioactive waste beside Utah’s Colorado River for decades; after trains began hauling it away in 2009, crews have now removed 17 million tons to a disposal site 30 miles away
    World

    A uranium mill left radioactive waste beside Utah’s Colorado River for decades; after trains began hauling it away in 2009, crews have now removed 17 million tons to a disposal site 30 miles away

    HFG INSIDER 897By HFG INSIDER 897October 1, 2026No Comments6 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link


    A uranium mill left radioactive waste beside Utah’s Colorado River for decades; after trains began hauling it away in 2009, crews have now removed 17 million tons to a disposal site 30 miles away

    For decades, millions of tons of uranium mill tailings sat beside the Colorado River near Moab, Utah, leaving behind a major environmental cleanup challenge in a landscape known for its red rock scenery and tourism. The waste came from a uranium processing site that operated during the Cold War era, and concerns grew over contamination near the river. According to the U.S. Department of Energy, crews began transporting the tailings by rail in 2009 to an engineered disposal cell about 30 miles away in Crescent Junction. In September 2026, the Moab Uranium Mill Tailings Remedial Action Project marked a major milestone: 17 million tons had been removed from the riverbanks.

    Read moreFrench proverb of the day: 'Little by little, the bird makes its nest' — a lesson on why slow, steady effort builds the strongest foundations

    How the waste reached the riverbank

    The material left near Moab was uranium mill tailings, the sand-like waste produced after uranium-bearing ore is processed. Although the tailings do not resemble the bright yellow uranium compounds often shown in popular culture, they can contain radioactive materials and other contaminants that require long-term management. The former Moab uranium mill operated near the Colorado River, an important waterway that supplies communities, supports agriculture and carries water through some of the American Southwest’s most environmentally sensitive landscapes.When the mill closed, the tailings remained at the site. For many years, the waste was stored in a large pile close to the river. Its location created concern because wind, erosion, flooding and groundwater movement could potentially carry contaminants away from the original site. The material was not treated like ordinary construction debris. It required a carefully planned removal process that could protect workers, nearby communities, transportation routes and the river corridor.

    Read moreAt least 9 killed as Russia launches fresh attacks across Ukraine's Dnipro, Zaporizhzhia

    Rail transport began in 2009

    The Department of Energy began moving the tailings by rail in 2009. Rather than carrying the waste by truck through surrounding communities and roads, the project used specially managed rail shipments to transport it from the Moab Site to Crescent Junction. The disposal cell is located approximately 30 miles away. It was engineered specifically to contain the material and reduce the possibility that water, wind or erosion could spread contamination. Moving 17 million tons is a logistical operation on a massive scale. Crews have had to excavate the tailings, load the material into rail containers, transport it to the disposal location and place it inside the engineered cell.Each stage involves monitoring and safety controls. The work must also account for changing weather, equipment maintenance, rail scheduling and the need to prevent dust or contaminated material from escaping during handling.

    Representative image

    Representative image

    Why the location matters

    The proximity of the tailings pile to the Colorado River made the Moab cleanup especially important. The river is not only a major regional water source, but also a defining feature of the surrounding environment. Moab is known for its national parks, desert landscapes and outdoor recreation. The river corridor supports wildlife and provides a route through a region where water is already limited. Protecting the area requires attention to both visible pollution and contamination that may move through soil or groundwater.The Department of Energy’s project is intended to remove the large surface pile and address contamination beneath and next to it. Removing the material reduces the risk associated with leaving a radioactive waste pile in place beside the river. However, the completion of the main removal milestone does not mean every part of the cleanup is finished. The site still requires monitoring, construction and restoration work.

    What remains to be done

    According to the Department of Energy, crews will continue developing and implementing a final groundwater compliance action plan. This work will determine how groundwater conditions are monitored and managed over the long term. The project also includes removing contaminated soil beneath and adjacent to the original surface tailings pile. Even after the visible waste has been transported away, material beneath the pile may require excavation or other treatment.Officials must also demonstrate compliance with radiological standards. That process involves testing and documentation to confirm that the site meets the requirements established for cleanup and long-term management. Other remaining tasks include disposing of equipment and infrastructure used during the project, completing the cover over the Crescent Junction disposal cell and stabilising the Moab site. Final stabilisation is expected to involve regrading the surface and revegetating the area so that it is less vulnerable to erosion.

    Building a long-term disposal cell

    The Crescent Junction site is designed to contain the tailings for the long term. Its cover will play an important role in managing moisture and protecting the disposal cell’s integrity. Water is a major concern in the management of radioactive waste. If rain or melting snow enters a waste pile, it can move contaminants through the soil and potentially into groundwater. A properly designed cover helps limit infiltration and reduces exposure to weather and erosion.The cover also needs to remain effective over many years. That means engineers must consider settlement, drainage, vegetation, surface runoff and the effects of extreme weather. Long-term disposal is therefore more than placing the tailings in a hole and covering them. It requires a stable design, monitoring systems and a plan for maintaining the site after active cleanup crews have left.

    A milestone, not the final chapter

    The removal of 17 million tons is a major achievement for the Moab Uranium Mill Tailings Remedial Action Project. It marks the movement of an enormous amount of radioactive waste away from the banks of the Colorado River and into a purpose-built disposal facility. The milestone also shows why environmental cleanup projects can take decades. The mill closed long ago, but the waste remained a complex responsibility for government agencies, engineers, workers and surrounding communities.For people living near the Colorado River, the project offers the possibility of a safer and more stable landscape. For officials responsible for the cleanup, the next phase will be focused on groundwater, remaining contaminated soil, the disposal cell cover and final restoration.The pile that once dominated the riverbank is gradually disappearing from the Moab landscape. Yet the project’s success will ultimately be measured not only by the amount of waste removed, but by whether the disposal site remains secure and the former mill property can be stabilised for generations to come.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleJim Carrey lists $35 million Maui mansion after secretly marrying longtime girlfriend Min Ah; 4,000-sq-ft oceanfront estate features private beach frontage, pool and guest house | English Movie News
    Next Article Pink ball in daytime Tests, penalties for time-wasting: ICC announces new playing conditions across men’s and women’s cricket | Cricket News
    HFG INSIDER 897
    • Website
    • Facebook
    • Pinterest
    • Instagram
    • Tumblr

    HFG Insider is your daily source for the latest News, Technology, Sports, Business, Health, Entertainment, and more. Stay informed with timely updates, trending stories, important developments, and engaging content from India and around the world all in one place.

    Related Posts

    World

    In 2011, Stephen King and Tabitha’s foundation gave $120,000 to help heat Maine homes, as their radio fundraiser brought in $241,820 for residents facing a winter with reduced federal aid

    By HFG INSIDER 897October 1, 2026
    World

    Two rival CEOs of Silicon Valley AI companies fight over an employee. Vinod Khosla, an investor in both, steps in

    By HFG INSIDER 897October 1, 2026
    World

    In 2019, a Maryland family moved a 255-year-old mansion 50 miles by barge; the 4,000-square-foot house travelled across Chesapeake Bay so they could give the historic building a new waterfront home

    By HFG INSIDER 897October 1, 2026
    World

    In 2013, Rob Scheer began packing backpacks at his dining table after recalling carrying his belongings in trash bags as a foster child; his charity has distributed 300,000+ backpacks

    By HFG INSIDER 897October 1, 2026
    World

    UK-Iranian man arrested with link to security incident at US-run RAF Fairford base in England

    By HFG INSIDER 897October 1, 2026
    World

    In 2018, a Vermont couple started with 30 sheep; seven years later, their solar-grazing business had 500 sheep managing vegetation across 1,500 acres of solar sites in the Northeast

    By HFG INSIDER 897October 1, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Don't Miss

    “It irritates me”: Richa Chadha on Ali Fazal’s “annoying” parenting, constant worries over daughter Zuni and why it is still a “good problem” |

    By HFG INSIDER 897October 1, 2026

    Richa Chadha and Ali Fazal became parents to their daughter Zuneyra Ida Fazal, fondly called…

    Pink ball in daytime Tests, penalties for time-wasting: ICC announces new playing conditions across men’s and women’s cricket | Cricket News

    October 1, 2026

    A uranium mill left radioactive waste beside Utah’s Colorado River for decades; after trains began hauling it away in 2009, crews have now removed 17 million tons to a disposal site 30 miles away

    October 1, 2026

    Jim Carrey lists $35 million Maui mansion after secretly marrying longtime girlfriend Min Ah; 4,000-sq-ft oceanfront estate features private beach frontage, pool and guest house | English Movie News

    October 1, 2026

    HFG Insider is your daily source for the latest News, Technology, Sports, Business, Health, Entertainment, and more. Stay informed with timely updates, trending stories, important developments, and engaging content from India and around the world — all in one place.

    HFG Insider | Stay Informed. Stay Ahead.

    Facebook Instagram Pinterest YouTube Tumblr Bluesky Threads
    Our Picks

    “It irritates me”: Richa Chadha on Ali Fazal’s “annoying” parenting, constant worries over daughter Zuni and why it is still a “good problem” |

    October 1, 2026

    Pink ball in daytime Tests, penalties for time-wasting: ICC announces new playing conditions across men’s and women’s cricket | Cricket News

    October 1, 2026

    A uranium mill left radioactive waste beside Utah’s Colorado River for decades; after trains began hauling it away in 2009, crews have now removed 17 million tons to a disposal site 30 miles away

    October 1, 2026
    Categories
    • Education
    • Entertainment
    • Environment
    • Lifestyle
    • Sports
    • Tech
    • World
    • Terms and Conditions
    • Privacy Policy
    • Contact Us
    • About Us
    © 2026 HFG INSIDER. All Rights Reserved.

    Type above and press Enter to search. Press Esc to cancel.